PERFORMANCE EFFICIENCY OF QUALITY CONTROL LABORATORY THROUGH IMPLEMENTATION OF LEAN OPERATION
:
https://doi.org/10.9744/jmk.24.1.64-72Keywords:
Lean, value stream mapping, efficiency, quality control laboratory, pharmaceutical industryAbstract
Lean operation is the common method to increase operational's efficiency, but it is still rarely implemented for Quality Control Laboratory. This paper used Value Stream Mapping to identify added value and non-added value activities from raw material analysis in Quality Control Laboratory of pharmaceutical industry. Efficiency was measured by reducing the turnaround time for raw material analysis and then converted into labor cost efficiency. Our research renders a decrease of 42.7% in turnaround time for the top 20 raw materials sample that received in 2020. In addition, it reduced the cost of labor by IDR 130,193,977 per year. These results showed us the importance of implementing lean operations in the laboratory to support pharmaceutical industries in producing quality and affordable drug products.
References
Adriatama, I., & Rahadi, R. A. (2021). Effect of governmental announcement and decisions during Covid-19 on Indonesian sectoral indexes. Jurnal Manajemen dan Kewirausahaan, 23(1), 61–75. https://doi.org/10.9744/jmk.23.1.61-75
Ana, G. (2019). The analysis of a production flow with the help of value stream mapping. Materials Science Forum, 957, 203–210. https://doi.org/10.4028/www.scientific.net/MSF.957.203
Ben Fredj-Ben Alaya, L. (2016). VSM a powerful diagnostic and planning tool for a successful Lean implementation: A Tunisian case study of an auto parts manufacturing firm. Production Planning and Control, 27(7–8), 563–578. https://doi.org/10.1080/09537287.2016.1165305
Bhamu, J., & Sangwan, K. S. (2014). Lean manufacturing: Literature review and research issues. International Journal of Operations and Production Management, 34(7), 876–940. https://doi.org/10.1108/IJOPM-08-2012-0315
Blecker-Shelly, D., & Mortensen, J. (2008). An introduction to lean. Continuing Education Topics & Issues, 10(3), 120–125.
Garza-Reyes, J. A., Betsis, I. E., Kumar, V., & Radwan Al-Shboul, M. A. (2018). Lean readiness The case of the European pharmaceutical manufacturing industry. International Journal of Productivity and Performance Management, 67(1), 20–44. https://doi.org/10.1108/IJPPM-04-016-0083
Gupta, S., Kapil, S., & Sharma, M. (2018). Improvement of laboratory turnaround time using lean methodology. International Journal of Health Care Quality Assurance, 31 (4), 295–308. https ://doi.org/10.1108/IJHCQA-08-2016-0116
Hamilton, L. (2018). Lean, lean six sigma, and the clinical laboratory. Medical Laboratory Observer, 50(2), 42–43. https://doi.org/10.151 5/reveh-2013-0015.6.
Isa, S., Hami, R., Hashim, H., Mohd Nizam, S., Harani, M. S., Sairi, S., & Salleh, M. J. M. (2020). Improvement of urgent tests laboratory turnaround time through laboratory lean management. Malaysian Journal of Medicine and Health Sciences, 16 (May), 15–21.
Jacobs, F. R., & Chase, R. B. (2018). Operations and supply chain management (Fifteenth). New York, NY: McGraw-Hill Education International Edition.
Khairi, M. W., Rahman, M. A., & Rusdi, M. (2016). Implementing lean manufacturing in Malaysian small and medium startup pharmaceutical company. International Conference on Mechanical, Automotive and Aerospace Engineering 2016, 755(1), 1–8. https://doi.org/10.1088/1742 6596/755/1/011001
Mantalean, V. (2020). Sah, UMK Depok 2021 naik jadi Rp 4,3 juta. Kompas.com. Retrieved from https://megapolitan.kompas.com/read/2020/11/22/05455131/sah-umk-depok-2021-naik-jadi-rp-43-juta?page=all
Marwanti, M. M., & Robiyanto, R. (2021). Oil and gold price volatility on indonesian stock market in the period of Covid-19 pandemic. Jurnal Manajemen dan Kewirausahaan, 23(2), 129–137. https://doi.org/10.9744/jmk.2 3.2.129-137
Myers, S., & Anthos, G. (2018). Using lean strategy to improve efficiency in pharmaceutical QC labs. https://www.pharmaceuticalonline.com/doc/ using-lean-strategy-to-improve-efficiency-in-pharmaceutical-qc-labs-0001
Naik, L., Sharma, R., Naik, R., Lakshmana, G., & Devi, K. (2011). Lean laboratory approaches for quality assurance in food. International Journal for Quality Research, 5(3), 187–192.
Natakusuma, M., Hidayatullah, N., & Purba, H. H. (2018). Reducing turn around time in laboratory using value stream mapping. International Jour-nal of Recent Engineering Science, 5(1), 16–21. https://doi.org/10.14445/23497157/ijres-v5i1p104
Pramadona, & Adhiutama, A. (2013). The application of lean manufacturing for operation improve-ment: A case study of black cough medicine production in Indonesia. The Asian Journal of Technology Management, 6(1), 56–64. https://doi.org/10.12695/ajtm.2013. 6.1.5
Rutledge, J., Xu, M., & Simpson, J. (2010). Application of the Toyota production system improves core laboratory operations. American Journal of Clinical Pathology, 133(1), 24–31. https://doi.or g/10.1309/AJCPD1MSTIVZI0PZ
Sales-Coll, M., de Castro, R., & Hueto-Madrid, J. A. (2021). Improving operating room efficincy using lean management tools. Production Plann-ing and Control. https://doi.org/10.1080/095372 87.2021.1998932
Scharton-Kersten, T., Shoel, G., Kimmel, L., Peytre-mann, C., Reynolds, T., Garay, J., Gazvoda, J., Orombelli, P., Gabardi, F., Dockery, M., & Sirovatka, J. (2010). Incorporating lean principles in-to pharmaceutical QC laboratory design: Building design influencing laboratory behaviours and effectiveness. East Hanover, United States: Novartis Vaccines and Diagnostics Inc.
Seth, D., Seth, N., & Dhariwal, P. (2017). Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: A case study. Production Planning and Control, 28(5), 398–419. https://doi.org/10.1080/09537287. 2017.1300352
Siahaan, G. E. D., & Robiyanto, R. (2021). Bond as a safe haven during market crash: Examination of Covid-19 pandemic in Asean-5. Jurnal Manajemen dan Kewirausahaan, 23(1), 1–9. https://doi.org/10.9744/jmk.23.1.1-9
Sieckmann, F., Ngoc, H. N., Helm, R., & Kohl, H. (2018). Implementation of lean production systems in small and medium-sized pharmaceutical enterprises. Procedia Manufacturing, 21, 814–821. https://doi.org/10.1016/j.promfg.2018.02.188.
Stadnicka, D., & Ratnayake, R. M. C. (2017). En-hancing performance in service organisations: A case study based on value stream analysis in the telecommunications industry. International Jour-nal of Production Research, 55(23), 6984–6999. https://doi.org/10.1080/00207543.2017.1346318
Suhardi, B., Anisa, N., & Laksono, P. W. (2019). Minimizing waste using lean manufacturing and ECRS principle in Indonesian furniture industry. Cogent Engineering, 6(1), 1–13. https://doi.org/10.1080/23311916.2019.1567019
World Heath Organization. (2011). Laboratory quality management system handbook. WHO Press, World Health Organization.
Zevitas (2012). Lean in the lab: Build it right and it will come. Retrieved from https://www.pharmamanufacturing.com/articles/2012/138/
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish on this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).